Extreme Engineering - Season 2 - Eps 5: Iceland Tunnels

2004-09-01? min⭐ 7/10

Around 200 miles northeast of the capital, Reykjavik, engineers are hard at work drilling 72km of tunnels deep in the mountains. Three full-face boring machines have been specially shipped from the US to this remote site, 100 miles south of the Arctic Circle. The tunnel’s purpose is to guide water to the valley floor from reservoirs that are also currently under construction. The cascading water will drive six turbines, each with a rated output of 115 megawatts. With a total capacity of 690 megawatts, it will be the biggest hydropower plant in Europe.

◀ Prev Next ▶

About Extreme Engineering

Extreme Engineering

Title: Extreme Engineering

First Air Date: 2003-04-13

Last Air Date: 2011-07-09

Status: Ended

Rating: 7/10 (from 20 votes)

Language: EN

Seasons: 9

Total Episodes: 77

Network: Discovery

Genres: Documentary

Production Companies: Powderhouse Productions

Synopsis

Extreme Engineering covers major construction projects from all around the world. Some are futuristic projects that may never be done, others are projects that are on there way to completion.

📺 Related Series